2025
2026



2025
2026
Managed by H2Ohio
Since Apr 2025
In Ohio, US
OHO128
This chronolog combines 47 photos from 34 contributors. Learn more
This project, located in the Black River Watershed, includes more than 60 acres of wetlands. Prior to construction, the property consisted of silt loam, or very deep somewhat poorly drained soils. By adding wetland features and native plants, the area is able to filter out nutrients before water flows into the Black River.
A Plan for Ohio's Watersheds